§ 19.07.041. Verification of water supply required.
No grading, building or plumbing permit application or plans for a project which will require new service with potable water shall be issued unless:
(1)
The chief building official is provided a written statement from the operator of a community or domestic water system that the purveyor will provide potable water service to the dwelling and that the water purveyor has sufficient water resource and system capacity to provide such service; or
(2)
The chief building official is provided evidence that a permit or other authorization has been granted by the water purveyor for the proposed project to connect to and use the community or domestic water system; or
(3)
An on-site well is installed, tested, and is certified to satisfy the requirements of Section 19.07.040(2), or the chief building official is provided evidence showing that potable water adequate to satisfy the standards of Section 19.07.040(2) is available on site. Evidence provided to prove availability of potable water shall include:
a.
Existing county data; or
b.
A report submitted by a registered hydrologist, geologist; or
c.
Satisfactory evidence from a test well drilled on the parcel.
d.
No final building inspection for a dwelling shall be approved until the dwelling is connected to an operating water supply approved pursuant to this section.
(Ord. No. 3343, § 1, 12-6-16)