§ 21.06.028. Monuments.  


Latest version.
  • (a)

    In making a survey, the surveyor shall set permanent monuments at all angle points and curve points on the exterior boundaries of the parcel or tract map, and at all parcel corners. Permanent monuments shall be set at angle and curve points on the centerline of the on-site streets so that each monument will be intervisible with at least two other monuments and shall be set at the point of intersection of all on-site streets. In the rural lands and agriculture land use categories, centerline street monuments at curve points may be omitted provided right-of-way monuments are installed at curve points.

    (b)

    Any monument as required by this title which is disturbed or destroyed before acceptance of all improvements shall be replaced by the subdivider.

    (c)

    All monuments shall be subject to the inspections and approval of the county surveyor before approval of the map. In case the street improvement work in the subdivision is proposed to be installed subsequent to the recordation of the map, the county surveyor may enter into a monumentation agreement with the divider and authorize posting of security in accordance with Government Code Sections 66495 et seq. to assure installation of the monuments required by this section which cannot be permanently placed until completion of the improvement work.

(Ord. 2636 § 51, 1993; Ord. 2581 § 29, 1992: Ord. 1986 § 2 (part), 1979)