§ 8.12.620. Permit—Term.  


Latest version.
  • A solid waste facilities permit has no specific term absent an expressed permit term or condition limiting the period of the permit pursuant to California Code of Regulations, Section 18213 (d). Solid waste facility permits, however, are required to be reviewed by the local enforcement agency every five years from the date of issuance and revised, as necessary, to reflect current conditions.

(Ord. 2604 § 1 (part), 1993)