§ 8.14.080. Issuance.  


Latest version.
  • (a)

    The permitting authority shall act upon the application no later than ninety days after it is accepted as complete, unless the applicant has filed with the permitting authority a written notice of a request, and received written approval for extension of the time within which action is taken on the grounds that additional time is required to:

    (1)

    Prepare or present plans or other information;

    (2)

    Obtain zoning variances, development plans, or other permits;

    (3)

    Make other corrections remedying inconsistencies with the provisions of this chapter; or

    (4)

    The permitting authority has on file a written notice from a public agency showing just cause for an extension of time, and has approved an extension of time pursuant thereto.

    (b)

    The permitting authority shall require the submittal of "as-built" drawings for permitted underground storage tank system construction or repair. The "as-built" drawings must show the actual location of newly installed systems including underground piping, conduits, monitoring equipment and other significant system components within thirty days of the final construction inspection. The permit to operate may be subject to revocation if accurate as-built drawings are not submitted to the permitting authority within the specified time frame.

(Ord. 3044 (part), 2004)